Granite top done by Danny at Oak Ridge Granite in Sonora.
Table was donated and auctioned off at the Sierra Waldorf School auction. Last I heard, table raised $2300.00 for the schoolTuesday, April 17, 2012
Fountain Top
Original top broke in a wind storm over the winter. Hand formed, with the plumbing going up the back. Slips into grooves where the original concrete top sat.
Monday, March 19, 2012
Tuesday, March 13, 2012
Flatbed 2
As soon as we got the first flatbed out, we rolled this guy in to finish up and get the owner back to work.
Clint working while I take pictures!
Three sides are removable
Flatbed
Built for a 2011 Ford F450 dually. Hurley Construction finished it and painted it before putting it on his work truck.
Cory Njirich pulled this one out with mini excavator.Thursday, February 16, 2012
Ruby June Benefit
This Saturday!
Hope to see you there, Tuolumne Memorial Hall in downtown Tuolumne City, just east of Sonora.
Email if you have any questions.
Tuesday, February 7, 2012
Saturday, January 7, 2012
Peak Performance Main Street Sign
This sign was actually installed before the Bradford st. sign, but I had forgotten to put these pictures up. So here they are not.
The entire design is actually plasma cut out by hand, with just the words "physical therapy" made in vinyl. Vinyl was cut out by Amos Graphics.
Subscribe to:
Posts (Atom)


























